Fibre Rollout Projects Frequently Asked Questions
Frequently Asked Questions

General

  • How do I check if my address is included and any key dates in my area for the fibre rollout?

    How do I check if my address is included and any key dates in my area for the fibre rollout?

    Check the status of your address via our address checker tool.

    As the rollout is happening progressively, not all addresses will have been assigned to a cluster at the start of the project. Once your address is assigned to a cluster, you’ll also be able to view the estimated windows for the fibre installation via the address checker tool.

  • How do I register my details?

    How do I register my details?

    Please go the website and register your address so that we can provide you with more information about your property as it gets ready to connect.

    If you do not register your details with us, we will be unable to contact you to book your lead-in and connection.

    Register for updates about the project and your premises.

  • Can I opt out or decline an installation?

    Can I opt out or decline an installation?

    Yes, you can choose not to have an installation carried out on your property. However, opting out means that Opticomm will not contact you or conduct the works at your property to connect your premises to the network. If you, or future owners of the property wish to connect to the Opticomm FTTP network at a later stage, charges will be incurred.

  • Can I keep my existing copper phone line (POTS)?

    Can I keep my existing copper phone line (POTS)?

    As Opticomm is building a new and independent network, existing services will not be impacted, including any copper phone line services. If you choose to amend or cancel these services, you’ll need to contact your current service provider.

  • If I get internet and phone as part of my service, can I keep the same number?

    If I get internet and phone as part of my service, can I keep the same number?

    As Opticomm is a wholesaler you’ll need to discuss your phone and internet requirements directly with your chosen service provider.

  • Will this affect my free to air TV services?

    Will this affect my free to air TV services?

    As Opticomm is building a new and independent network, existing services will not be impacted, this includes free to air TV services.

  • I already have Sky Muster™/Starlink/ADSL, will this replace them? Will I lose them?

    I already have Sky Muster™/Starlink/ADSL, will this replace them? Will I lose them?

    As Opticomm is building a new and independent network, existing services will not be impacted, including any Sky Muster™/Starlink/ADSL services.

  • What happens to my existing wireless or mobile services?

    What happens to my existing wireless or mobile services?

    As Opticomm is building a new and independent network, existing services will not be impacted, including your existing wireless or mobile services. If you choose to amend or cancel theses services, you’ll need to contact your current service provider.

Frequently Asked Questions

Installation (lead-in, exterior works)

  • How long will installation take, do I need to be at home when it happens?

    How long will installation take, do I need to be at home when it happens?

    Each property is different, and installation timeframes vary based on works required. This will be discussed with you, prior to the commencement of any works.

    Someone over the age of 18 years must be at home during the installation appointment to give permission for the lead-in work to be undertaken, otherwise the work cannot proceed. If this this person is not the property owner, they must have the owner’s permission for the work to be carried out as well as agree to the lead-in pathway and device location at the required spot on your property. You will need to also provide details of any special aspects of the property that we should be aware of.

  • Why have I not been notified of my lead-in appointment?

    Why have I not been notified of my lead-in appointment?

    First, you will need to register your details, so we can provide you with updates, and reach you to book an appointment for your lead-in installation and connection. If you do not register your details with us, we will be unable to contact you to book your lead-in and connection.

    As the rollout is happening progressively, not all addresses will have been assigned to a cluster at the start of the project. Once your address is assigned to a cluster, you’ll also be able to view the estimated windows for the fibre installation via the address checker tool.

  • How do I reschedule my installation appointment?

    How do I reschedule my installation appointment?

    To reschedule your fibre installation appointment please call our approved technicians on 1300 855 041 as soon as possible so that they can make alternate arrangements for you.

    To avoid additional charges, rescheduled appointments must be within the advised date range for your address.

  • How deep will the lead-in conduit be on my property?

    How deep will the lead-in conduit be on my property?

    The lead-in conduit will be direct buried at a depth of approximately 30cm. This may be dependent on the composition of the soil/rock or other features in the area.

  • I have other utilities running through my property, how will you know where they are?

    I have other utilities running through my property, how will you know where they are?

    Your knowledge on where these are located will be a huge benefit to us and we’ll work to ensure that these are not damaged during the installation stage.

  • What is the width of the trench?

    What is the width of the trench?

    The direct buried trench is approximately 30cm in depth or slot trench approximately 100mm to 150mm.

  • What machinery will be on my property to install the lead-in?

    What machinery will be on my property to install the lead-in?

    Slot trenching – small to medium truck or direct buried trench, small digging machine.

  • I have a tree/garden, can you go around that?

    I have a tree/garden, can you go around that?

    In every instance we will avoid trees or going under gardens, however, we will work with you to ensure the least impacted pathway is taken without compromising the fibre connection.

  • I have a fence, how will you go through that?

    I have a fence, how will you go through that?

    No impact is anticipated to any fencing. The lead-in will be run underneath the fence or within an open space (driveway) on your property.

Frequently Asked Questions

Devices

  • What devices will be placed on my property?

    What devices will be placed on my property?

    There will be 2 devices installed at your house.

    There will be a PCD (Premises Connection Device) installed on the exterior of your property. It will be placed on the side of the property, preferably in the location of other utility boxes (such as the power circuit board).

    The second device is a connection box or NTD (Network Termination Device), which will be installed inside your house close to a power point. The NTD (inside) will be placed within 2m of the PCD (outside).

  • How big are the devices that will be attached in and out of my property?

    How big are the devices that will be attached in and out of my property?

    The outside device (PCD) is D 37mm x W 95mm x H 130mm (white).

    The internal device (NTD) is D 43mm x W 193mm x L 231mm (black). The NTD will need to be installed close to a power plug and within 2m of the PCD.

  • Will I need a new modem/router?

    Will I need a new modem/router?

    Your chosen phone and internet provider will be able to advise what equipment you need.

Frequently Asked Questions

Damage / Reinstatement / Issues

Get in touch...

Register your address details

Register your details to keep up to date with information about your property, and we’ll be in touch ahead of any works needing to be carried out.

If you have any further questions, please check the Opticomm FAQ page <link> or submit an enquiry through <link project enquiry page>